[FIXED] Davisville Subway Yard [MOM]

If you liked this item, please rate it up on Steam Workshop page.

Author: JSF-1

Last revision: 19 Sep, 2017 at 22:49 UTC

File size: 2.93 MB

On Steam Workshop

Description:

UNSUBSCRIBE FROM THE OLD VERSION AND USE THIS ONE INSTEAD!

This is a Subway Yard so you will need the Metro Overhaul Mod for this to be of any use.

Davisville Yard opened in 1954 with the Yonge Subway and is Toronto’s first subway yard. The facility at the time was used to store trains on the Yonge Line (now Line 1) however in the 90’s the facility was closed due to the opening of the bigger Wilson Yard. Davisville was re-opened in 2002 with the opening of the Sheppard Line to store and maintain trains on that line as well as various work trains.

Update:
> Fixed loading issue
> Removed some tracks for easier use

Cost to build: $75,000
Upkeep: $768
Size: 15×7

Download
Required items:

Click the title to search on this site.


Metro Overhaul ModSteam Workshop