Edmonton City Hall
Opening in 1992 this facility was built to replace Edmonton’s old City Hall which was built on the same sight. It was designed by Dub Architects.
Cost to build: $40,000
Upkeep: $640
Size: 14×9
Cities: Skylines Mods Catalogue
Opening in 1992 this facility was built to replace Edmonton’s old City Hall which was built on the same sight. It was designed by Dub Architects.
Cost to build: $40,000
Upkeep: $640
Size: 14×9