16MW Waste to Energy Incinerator
The Jorfik Trashblaster 16K will incinerate up to four times the waste of the standard incinerator.
More efficient than the standard incinerators, with cheaper running costs and lower water consumption per unit of waste processed, but a higher up front cost.
I’ve balanced the upkeep after the Green Cities recycling centre, because the standard incinerator is pretty much pointless now.
Stats:
Cost: ¢90 000
Upkeep: ¢1280
Footprint: 8×12
Waste processing rate: 192 000
Power Output: 16MW
Garbage Trucks: 40
Water Consumption: 192m^3
Pollution: 35, 100 radius
Noise Pollution: 50, 100 radius
1024 textures, ~3200 tris