GTH Turbine hall 1
Geothermal turbine hall. The kit is now ready in the main part.
Those large horizontal openings on the sides (close to the ground) are for the pipes. I decided to leave that part very simple not to clutter the whole deal with tons of geometry – the pipes alone are pretty heavy. The hall actually has the least geometry of them all, maybe transformer as well.
You can connect 2 or 3 separators to the hall if you have the patience to set up the pipes. You should have even ground.
The hall is the only building that requires a road.