Generic Industry (Large) – 5 Roads
Generic Industry Road Layout:
–use TM-PE to Close CROSS WALKS, Where Citizens cross Truck Lanes ( E,g., Cross walks crossing Bus Lane- Doesn’t block Trucks)
–Three Lane 1-Way Highway @ Top is for Direct Route To A Commerical District/ Zone…Smaller Comm. Areas Along Connertor Roads Can Use Regular Highway System
–Of the 4-Lane Roads With Indy Buildings—-At EXIT END, Have Center Middle two lanes Splt Traffic to each 1-Way Road….( No Road Arrows on other Lanes)….This will allow trucks leaving don’t interfere with either side Building Deliveries
— Place Services (Fire,Police, Garbage, Recycle,Cemerity, Etc….) At top 4-Lane 1-Way Highway
–Check to besure any traffic lights are removed…Note With TM-PE , You Can Fix it So Traffic Lights Ever Auto Install…Can’ remember what set